I have a Building of Material 1[BOM-1] and within that BOM-1, there are items AND another BOM (BOM-2) in it.
Is it possible to assign a routing/routing link code to BOM-1 and it will apply to BOM-2 within it?
I have a Building of Material 1[BOM-1] and within that BOM-1, there are items AND another BOM (BOM-2) in it.
Is it possible to assign a routing/routing link code to BOM-1 and it will apply to BOM-2 within it?