Hi,
Newbie here and a total novice so please bear with me.
We just had an upgrade done from Navision 5 to Dynamics NAV 2009 R2 running the Classic client. We are in a workgroup envrionment so there are no group policies or anything like that in place. Since the upgrade, NAV as a whole has been running a little slower, but our reports are running VERY slow. It is taking up to 5 minutes to produce a simple Aged A/P or A/R report when before it would run in about 30 seconds. We also run Jet Reports and have the same issue. The guy that did our install is great with database work, but not so much when it comes to things like this. He thought it may be a hardware issue, but our server is only a couple years old and when I check the resources being used while running reports it's not struggling at all. I am only running 4 GB or RAM in it because it's running 32-bit Windows 2003 but I don't know if that's the issue. So my question is, are there any simple things I can check to try to increase the speed? I don't know if there are some settings I can look at or possibly a hotfix or something available. Here is the current build: Version HCM 6.00.04.01, US Dynamics NAV 6.0 R2 (6.00.33413) If I can provide any more details that would help I'll give it my best shot, but I'm not very knowledgeable with this software at all.