Blog Post: Construction Position and Norms – analysis/reporting (7/7)

$
0
0

Normative status

When we finished all works on configuring normatives, we need to change status to Certified. If we don’t change status, we cannot link this Normative with Construction Position. Changing normative status, we do with ‘Apply’ command (status is changed from New to Certified). Now we can link this normative with Construction Position. But if we want to change some details in this normative, we need to change status again, but now with ‘Reopen’ command (status will be changed from Certified to Under Development). Now we can change everything and after that, we have to change status to Certified again.

Normative version also has statuses. We can change their status on Normative Version Card using option field ‘Status’. Statuses are the same as main normative statuses. If we want to use some version, besides starting date, we have to set version status to Certified. To link normative and use in other documents (if we use versions), normative status and normative version status must be set to Certified.

Statistic

When we configure complete normative, we can use Normative Statistic to see very interesting informations. To start this, we need start ‘Statistic’ command from normative header.

Image

We can see sum of quantity, cost and price per items and per resources. We can see participation by percent in total quantity, cost or price. We can see margin form cost to price also.

Reports

We have many reports and analysis tables:

  • Where-used normatives
  • Normative list
  • Optimal normative
  • The best normative cost